Реконструкции в отелях
| HOTEL | REASON | NOISE LEVEL | DATE OF BEGINNING | DATE OF COMPLETION | |||
| FUJAIRAH | |||||||
| Hotel JAL Fujairah Resort & Spa | Japanese Restaurant “ICHO” is not operating due to renovation | None | 11-Jul-08 | TBA | |||
| Miramar Al Aqah Beach Resort | The hotel's main swimming pool will be fully closed for maintenance while the indoor pool will be in operation and for sure the beach area in full operation . | Pool - 1 | 1-Aug-11 | 29-Aug-11 | |||
| Le Meridien al Aqah | The hotel will do refurbishment works at Views Restaurant which will commence starting early June 2011. During this period, meal services will be done in Hajar Ballroom. | Room - 0, Restaurant - 1 | 1-Jun-11 | 31-Aug-11 | |||
| Le Meridien al Aqah | The hotel's pool (shallow side first then followed by the main pool) will be emptied in order to carry out essential maintenance works - re-tiling of pool deck. | Pool - 2 | 1-Aug-11 | 31-Aug-11 | |||
| Le Meridien al Aqah | Construction of a new hotel property on the right side of the hotel is on hold until further notice | Beach - 2, Pool - 2 | 1-Jun-08 | TBA | |||
| AJMAN | |||||||
| Kempinski Hotel Ajman | The hotel's Italian Restaurant - Sabella’s will be closed due to renovation works on July 02nd and is expected to re-open after Ramadan. | Room - 0, Restaurant - 1 | 2-Jul-11 | 31-Aug-11 | |||
| ABU DHABI | |||||||
| Al Raha Beach Hotel AUH | Aldar Development: Work is on-going on a new development across the hotel beach for offshore land reclamation - beach hotel expansion. | Pool - 1, Beach -1, Room - 0 | 13.янв.10 | TBA | |||
| Emirates Palace | The hotel will be upgrading the West Wing Pool to enhance the facilities and guest experience. During this period the West Wing Pool will temporarily be unavailable for guests. No major inconvenience to guests is expected as the maintenance will not involve noise disturbance and the guests will have access to the East Wing Pool. For guests' convenience the hotel will offer a continuous golf buggy service from West to the East Wing Pool during this period. |
Pool - 1 | 07.авг.11 | 17-Aug-11 | |||
| Park Rotana Hotel Abu Dhabi | The hotel's Ginger Restaurant will be closed due to maintenance. During this periode buffet breakfast, lunch and dinner will be served on Garden Rooms 1 & 2 on the hotel's conference level. | Restaurant - 1 | 27.июл.11 | 8-Aug-11 | |||
| Beach Rotana Abu Dhabi | The hotel's Kids Swimming Pool will be closed due to maintenance works. | Pool - 1 | 08.авг.11 | 10-Aug-11 | |||
| InterContinental Hotels Dubai Festival City | The hotel will be closed due to maintenance works. | Restaurant - 1 | 01.авг.11 | 31-Aug-11 | |||
| Fairmont Bab Al Bahr, Abu Dhabi | The main hotel pool will be closed for maintenance. The beach area, Poolside and children’s pool will remain open throughout this time, and as an alternative the swimming pool at the Arzanah Beach Villa (Number 9) will also be available for use by hotel guests and members |
Pool - 1 | 10.июл.11 | 31-Aug-11 | |||
| Al Raha Beach Hotel AUH | La Piscine Restaurant and Bar, the main swimming pool and beach areas will be closed for complete renovation. | Pool Bar - 2 | 01.июн.11 | 30-Oct-11 | |||
| Crowne Plaza Abu Dhabi Yas Island | The hotel's main swimming pool will be closed due to maintenance works. During this period all in-house-guest can use the pool at Staybridge Suites | Pool - 1 | 10.июл.11 | 30-Jul-11 | |||
| Sheraton Abu Dhabi Hotel & Resort | Il Paradiso Restaurant will be permanently closed due to the renovation. As alternative dining options to the guests,the below restaurants will serve as alternatives: La Mamma Italian Restaurant (12:00 -3:30 pm to 7:00 – 11:30 pm) Flavours Restaurant (12:00 -3:30 pm to 7:00 – 11:30 pm) Bravo Tapas Bar & Restaurant (6:30 pm to 01:00 am) El Sombrero Restaurant (6:00 pm to 01:00 am) |
None | 09.май.11 | - | |||
| Desert Islands Resort & Spa by Anantara | The resort has recently completed a soft refurbishment of its pool as part of the ongoing commitment to maintain and improve product offering. In addition, the exciting development of the two new 30 unit Lodges on the Island is underway with completion. The conference centre located on the adjacent plot to the resort will also be completed at the same time. Any disruption has been kept to a minimum as the conference centre is some 200m away from the end of the resort with discreet screening in place. | Visual disturbance - 1 | 23.фев.11 | 15-Dec-11 | |||
| Beach Rotana Abu Dhabi | There is ongoing construction work on Reem & Sowah Island located opposite the hotel at a distance of approximately 500 meters. | Pool - 2 , Beach -2, Visual disturbance - 1 | 01.дек.08 | 30-Jan-12 | |||
| Le Royal Méridien Abu Dhabi | The hotel is partially transforming and upgrading its guestroom decor.All leisure facilities, bars and restaurants are open and will operate as normal during this process. | Pool - 2, Room - 2 | 10-Jun-10 | TBA | |||
| International Rotana Inn | The hotel has announced that it will be closed for renovation until further notice | None | 1-Jun-10 | TBA | |||
| Traders Hotel, Qaryat Al Beri | There is currently construction work taking place to create a car parking facility for the hotel. Work involves some construction noise however, all work will be carried out in normal working hours (08:00am till 05:00pm, daily). There are also several projects underway in the surrounding area. This includes work on the Fairmont Hotel, next to Traders Hotel. The hotel have been informed that there will be some construction noise from this work however, we are unable to confirm the hours of this work as this is not related to the property. There will be hoarding covering the area where most work is taking place so visual disruption should be kept to a minimum. During this time, the hotel will do their utmost to minimise disruption to guests. We will endeavour to locate your rooms away from the car park site. Also, please note that the leisure pool at the Residences is used for the Traders guests in addition to the one located in the Traders Hotel. |
Pool - 2 , Beach -2, Room - 2 | 20-Jan-10 | TBA | |||
| Aloft Abu Dhabi | Construction work of Capital Gate Centre project on one side of the hotel (apox. 100m from hotel) | external areas -1 | 10-Jan-10 | TBA | |||
| Sheraton Abu Dhabi | Construction & Development nearby the Hotel (apox. 100 m from hotel premises) -extended | Beach - 2 , Room - 1 | 1-Feb-08 | TBA | |||
| Sheraton Abu Dhabi | The construction in the areas adjacent to the resort are carried forward | External areas-2, Room-2 | 25-Mar-08 | TBA | |||
| Intercontinental Abu Dhabi | Ritz Carlton villa development taking place 1 km from the beaach |
Some visual and noise disturbance |
01.сен.07 | TBA | |||
| Hilton Abu Dhabi | Construction of a shopping mall and residential building next to the hotel - 100 m |
Room - 2 | 04.дек.07 | TBA | |||
| DUBAI | |||||||
| Amwaj Rotana | The hotel will have a Bath Tub Project in the Classic Sea View and Premium Sea View Rooms. Works are being daone daily, from 09:00am till 05:00pm. Noise will be heard but at a minimal evel as they are using drill, cutter, hammer, chisel, screwdriver for this refurbishment. | Room - 2 | 10.май.11 | 31.авг.11 | |||
| Hyatt Regency Dubai | The Galleria Ice Rink will be temporarily closed due to maintenance work. | Lobby - 2; Visual and noise disturbance - 1 | 01.авг.11 | 30.сен.11 | |||
| The Radisson Royal Hotel, Dubai | The hotel's swimming pool will be closed for scheduled maintenance. | Pool - 1 | 01.авг.11 | 07.авг.11 | |||
| Radisson Blu Hotel, Dubai Deira Creek | The hotel's swimming pool will be closed for yearly maintenance. As an alternative, guests will be able to use the swimming pool at the Sheraton Dubai Creek Hotel and Towers, located at a 100 meters distance from the hotel at free of cost. Sheraton pool is accessible from 6:00 AM until 10:00 PM every day. |
Pool - 1 | 06.авг.11 | 16.авг.11 | |||
| Le Meridien Mina Seyahi | The Horizon Pool and Bar will be closed due to maintenance works. | Pool - 2 | 01.авг.11 | 15.авг.11 | |||
| Le Meridien Mina Seyahi | The hotel's main lobby will be partially closed due to some maintenance works. The reception area will remain unaffected and operational during this period. | Lobby - 2; Visual and noise disturbance - 1 | 08.авг.11 | 18.авг.11 | |||
| Westin Dubai Mina Seyahi | The Kids pool will be closed due to maintenance works. | Pool - 2 | 17.авг.11 | 27.авг.11 | |||
| Jumeirah Beach Hotel | The hotel will start remodelling of their rooms. The project work is scheduled to commence on 70 of the rooms in the ‘North Wing’, from the 16th to 23rd floor. Please note that all other guest facilities such as our restaurants, Conference Centre, pools, Sinbad’s Kids Club, Pavilion Sports Club, beach and Marina are unaffected and will remain open for business as usual. Guests can also use their complimentary access to Wild Wadi Waterpark which has recently opened two additional thrilling rides. Every effort will be made to keep the disturbance from the renovations to a minimum, with the main work being carried out from between the hours of 10am and 6pm. | Room - 1 | 01.авг.11 | 15.дек.11 | |||
| City Center Hotel – Managed by Pullman | The first phase of refurbishment which was limited to 11th, 10th & 9th floors is due to be completed by August 2011 as per the below schedule: • 10th floor will operational by August 7th 2011 • 11th floor will be operational by August 15th 2011 • The Executive lounge will be operational by August 30th 2011. And the 9th floor will be used as an empty “buffer” to limit disturbance. The work is still restricted to take place between 10:00hrs & 18:00hrs and maximum noise levels has been record at 85dB (equivalent to city traffic), reducing by 10dB for each descending floor. The second phase of room refurbishment which is limited to 8th, 7th & 6th floors will commence August, 7th until October, 16th 2011 with the 5th floors being used as an empty “buffer” to limit disturbance. Please note the swimming pool will be closed from, September, 15th till December, 31st 2011 and the SPA will close, from September 15th till January, 31st 2012. Refurbishment of all other public areas will commence from August 1st 2011 and will continue till February 2012. The all day dining outlet & hotel bar will remain operational throughout the refurbishment period. |
Rooms - 1 | 30.апр.11 | 15.авг.11 | |||
| Ibis Al Barsha | There is a construction of residences (villas) behind the hotel, at the other side of the road. They operate from Sunday till Thursday, 05am till 17pm. However, noise is barely heard at the hotel as they have double glazed windows - filtering unwanted noise. | Room - 1, Noise & visual disturbance - 1 | 21.апр.11 | 30.авг.11 | |||
| Le Meridien Dubai | The hotel is expanding with additional 197 bedrooms coming up. There are works at the back of the hotel -- way from pools and restaurants. Works are being done daily, except Friday, from 09:00am till 06:00pm. | Noise & visual disturbance - 1 | 21.апр.11 | TBA | |||
| Grand Millennium Hotel Dubai | There are building constructions at the backside of the hotel, approximately 100 meters away. These projects started from last year and expected to be finished before the year ends. Works being done daily except Friday, from 08:00am till 05:00pm | Visual disturbance - 1 | 01.янв.10 | 30.ноя.11 | |||
| Holiday Inn Al Barsha | There is a small construction work next to the Coral Boutique located across the road which is approximately 200 meters away from the hotel. There is also the addition of floors to an existing building (with tenants) behind the hotel. Both works do not affect the hotel's daily operations are the hotel is protected from the noise they cause. No complaints from the guests have been reported as of the moment. | Visual disturbance - 1 | 18.апр.11 | 30.ноя.11 | |||
| Desert Palm Dubai | The Polo Suites construction will not have any impact on guests. The hotel have completed the heavy work with only the interior work now being completed. The conference center is also undergoing some refurbishments. Both work areas are away from the guests hence, do not pose any disturbance. | Visual disturbance - 1 | 01.янв.11 | 30.сен.11 | |||
| Metropolitan City Hotel Dubai | The hotel is planning to re-design the “Fusion Garden” – located at the back of the hotel. | External Noise and Visual disturbance - 1 | 15.май.11 | 30.авг.11 | |||
| Karama Hotel | There are minor maintance works going on at the 2nd and 3rd floor of the hotel. Works are being done daily and starts from 09.00hrs to 12.00hrs. | Room - 1, Visual Disturbance - 1 | 17.апр.11 | TBA | |||
| Marriott Dubai Harbour Hotel & Suites | There is a building construction going on beside the hotel however it doesn't affect the hotel's daily operations. Works are being done daily except Friday. | Room - 1, Visual Disturbance - 1 | 17.апр.11 | TBA | |||
| Dusit Thani Dubai | There are construction works going on around the hotel - the front side (50 meters away from the hotel) where RTA (Road and Transportation Authority) is finalizing the construction after the Dubai Metro line, from the left side and the back is the project of the business bay tunnel and street. Due to the soft construction works and due to the sound proof glass around the hotel rest assured no noise can be heard through the hotel premises. Works are being done daily, except Friday, from 07:00am till 07:00pm. | Noise and Visual disturbance - 1 | 17.апр.11 | 31.дек.11 | |||
| City Centre Hotel Managed by Pullman | The hotel has announced that they will be commencing the first phase of the Refurbishment of City Center Hotel to the New Pullman Dubai City Centre hotel from 20th Apr 2011. As of now, they will be starting their bedroom refurbishment incuding the Executive Loung on the 11th Floor. The Hotel will advise on a later stage when they will start the renovation of the public areas including Lobby, food & beverage outlets and meeting rooms. The hotel also advised that all the necessary precautions will be taken to minimize noise levels and for now there should be no heavy drilling or construction, thus the guests will experience minimal noise disruption. |
Public 1, Room 1 | 05.апр.11 | TBA | |||
| Grand Moov Hotel | The hotel is undertaking major renovation work and they have planned to close the hotel for few days. Due to aforementioned reason effective today they will not be able to take any bookings till further notice. | None | 22.июл.10 | TBA | |||
| Bonnington Jumeirah Lakes Towers | Construction going on the road next to the hotel | Visual disturbance - 3, Room - 0, External - 1 | 30.июн.08 | TBA | |||
| Nuran Greens | Construction going on on the road, at the side of the hotel. | External areas - 1 | 29.июл.10 | TBA | |||
| Grosvenor House | The hotel is expanding with the construction of the second tower and it has reached to the 45th level. | External areas - 2; Visual disturbance- 3 | 01.янв.08 | TBA | |||
| The Address Marina | The Club lounge at the Hotel will be closed with immediate effect until further notice. | None | 27.май.10 | TBA | |||
| The Ritz-Carlton | The expansion development of the resort.The only closed areas are La Baie, the Spa pool and part of the landscaped gardens. | Room - 1, External - 2 | 15.июл.10 | 30.ноя.11 | |||
| Golden Tulip Al Barsha | Roadworks in vicinity of the hotel and construction work of a new building next door to the hotel | external areas-2, room 1 | 25.июн.09 | TBA | |||
| The Oceanic Hotel | Renovation of Guest Rooms, Lobby area, Kitchen, and restaurants.One restaurant will be operational during the renovation period. The renovation will be from 8:00am till 8:00pm everyday. | TBA | 15.май.09 | TBA | |||
| Jumeirah Beach Hotel | Ongoing construction work to the Marina | Beach-1 | 09.окт.08 | TBA | |||
| Sheraton Jumeirah Beach | The Jumeirah Beach residence project | Land view- 2,Sea view-1 | 2003 | TBA | |||
| The Le Royal Meridien Jumeriah | Ongoing construction of The Ritz Carlton hotelwhich can be seen from the Tower Rooms. | Tower Room ,Seaview- 3 | 2010 | TBA | |||
| Al Habtoor Grand Hotel | The Jumeriah Beach residence project | Land view-2,Sea view-1 | 2008 | TBA | |||
| Al Habtoor Grand Hotel | Construction on the right side of the beach - works on the wave breaker |
Beach - 2 | 2006 | TBA | |||
| Jebel Ali Palm Tree Court & Spa | Palm Tree Court & Spa luxury extension - on hold till 2011 | External areas-1 | 10-Jan-10 | TBA | |||
| Jebel Ali Hotel & Golf Resort | Construction of the Palm Island - on hold till 2011 | Beach - 1 | 25-Jun-05 | TBA | |||
| Jebel Ali Hotel & Golf Resort | Land profilint works on the waterfront development - on hold till 2011 | Beach - 2 | 15-Dec-06 | TBA | |||
| Jebel Ali Palm Tree Court & Spa | The planed cosmetic refurbishment of the Palm Tree Court & Spa rooms has already begun and there might be unanticipated levels of noise and some visual disturbance for the guests staying at the Junior Suites in the Palm Tree Court & Spa during the day. This refurbishment works are being carried out during the summer period. | Beach/Pool - 1, Room - 1 | 5-Jun-11 | 31-Aug-11 | |||
| Qamardeen | The right wing of the hotel is facing construction work | Room - 1 / Pool - 1 | 15-Nov-07 | TBA | |||
| The Palace - Old Town | The hotel is surrounded by constructions / Burj Dubai Area |
Room - 1 / Pool - 1 | 15-Nov-07 | TBA | |||
| RAS AL KHAIMAH | |||||||
| Banyan Tree Al Wadi | The hotel is upgrading the entire Beach Club area. The upgrade consists of rectifying a small portion of the beach due to erosion by the recent storm, placing a layer of white beach sand and further landscaping throughout the area. | Beach Area - 1 | 12.июл.11 | 30.авг.11 | |||
| Al Hamra Fort Hotel | Most of the dredging work in the lagoon next to the hotel is over, but there are still some constructions work going on | External areas-1 | 08.сен.09 | TBA | |||
| Al Hamra Fort Hotel | Constuction of the Al Hamra Palace building is almost complete; only the interior design of the new property is continously going on | Beach & Pool Area - 1, Visual Disturbance - 1 | 1-Aug-06 | TBA | |||
| Al Hamra Town Houses | Constuction of the Al Hamra Palace building is almost complete; only the interior design of the new property is continously going on | Beach & Pool Area - 1, Visual Disturbance - 1 | 1-Aug-06 | TBA | |||
| SHARJAH | |||||||
| Lou'Lou'A Beach Resort Sharjah | The hotel's main swimming pool will be closed due to maintenance and upgrade works. However beach and health Club facilities remain to be operational for guests' use. Guest's who would like to have pool experience, they could use the swimming pool at Sharjah Premiere Hotel & Resort | Pool - 2 | 01.июл.11 | 10.авг.11 | |||
| Sharjah Grand Hotel | The hotel's main swimming pool will be closed due to annual maintenance. However, the beach and other sporting club facilities will be available to all guests. | Pool - 1 | 07.авг.11 | 12.авг.11 | |||
| Sharjah Grand Hotel | there will be a Tennis Court Renovation works and another facilities at the Hotel during this Summer. | Beach-2/Pool-2, Room - 1 | 15.апр.11 | 31.авг.11 | |||
| AL AIN | |||||||
| Mercure Grand Hotel Jebel Hafeet | Construction of another wing of the hotel, entirely separate from the Hotel at a distance of more than 100 mtrs. In regards to this the Tennis Court has been eliminated from the list of Recreational facilities on offer. Works are done everyday, except Friday, from 08:00am till 07:00 pm. | Pool-1, Visual Disturbance - 1 | 15.апр.11 | 31.дек.11 | |||
| DOHA | |||||||
| Four Seasons | Construction of the Nobu restaurant on the far end of the hotel's marina, approximately 300 metres from the beach. | Beach-2/Pool-2 | 01.ноя.08 | TBA | |||
| BAHRAIN | |||||||
| The Ritz-Carlton, Bahrain Hotel & Spa | The hotel's La Mediterranee Restaurant will be closed for renovation Guests are encouraged to utilize Primavera Restaurant for their breakfast, lunch and dinner where a sumptuous buffet will be served. | Restaurant - 2 | 17.июл.11 | 30.сен.11 | |||
| The Ritz-Carlton, Bahrain Hotel & Spa | The hotel's Plums Restaurant will also be undergoing renovation. | Restaurant - 2 | 20.июл.11 | 31.авг.11 | |||
| The Ritz-Carlton, Bahrain Hotel & Spa | The Club Lounge is undergoing urgent repairs & maintenance and will not be operational . The hotel is arranging the following alternative arrangements for our Guests booked on club level, they can utilize the following benefits: • Breakfast : La Mediteranee Restaurant. • Light Snacks : Lobby Lounge • Drinks : Lobby Lounge |
Club Lounge - 2, Room - 1 | 25.июн.11 | 08.июл.11 | |||
| 1 - LOW | |||||||
| 2 - AVERAGE | |||||||
| 3 - HIGH | |||||||
| Construction Work Disturbance | |||||||
| In view of the level of construction work going on in Dubai and the disturbance that this may cause | |||||||
| visitors, hotel establishments and tour operators must inform the customers in advance of any nearby | |||||||
| developments that may affect their stay. Such advice must also appear in your brochures and websites, | |||||||
| where practical. | |||||||
| Kindly note that under the European package travel regulations, the customer has the right to | |||||||
| withdraw from the contract without any penalty if the building work seriously affects their enjoyment. | |||||||
| We strongly advice you to familiarize yourself with the content of the above regulations. | |||||||
| We also urge you to use the statement below in response to any queries from the overseas media or | |||||||
| the leisure and business travellers. | |||||||
| Dubai Anticipates Future Demand | |||||||
| "Many exciting hotel and leisure infrastructure developments are underway in Dubai to ensure that the | |||||||
| Emirate remains at the forefront of advancement to meet the anticipated future demand of the discerning | |||||||
| traveler. Room stock in Dubai will more than double within the next 10 years and the offering of | |||||||
| entertainment and leisure facilities is set to expand dramatically. | |||||||
| The landmark developments are very timely to secure the emirat's continued future growth, Dubai has | |||||||
| developed a reputation for its bold and innovative approach in the creation of many architectural wonders. | |||||||
| Whilst there is a general curiosity about the latest developments in the emirate, we also recognise that | |||||||
| any unwanted disruption needs to be kept to a minimum." | |||||||
| Your cooperation would be highly appreciated. | |||||||